Check Your Lot Grading
- Ensure the ground slopes away from your foundation
- Pay special attention to areas under decks, stairs, and window wells
- Keep side yard and rear yard swales unobstructed and free-draining
If you are unsure how your lot should drain, you can request your Lot Grading Plan from the Engineering Department by emailing engineering@steinbach.ca.
Complete Final Landscaping Properly
- Final landscaping (topsoil, sod, decorative materials) should only be installed after rough grading has been approved
- Rough grade is typically 4 inches (100 mm) below final grade
Maintain Window Wells
- Install and maintain window wells where required
- Ensure grading around windows allows proper slope away from the foundation
Manage Roof Drainage
- Clean eavestroughs and downspouts regularly
- Ensure downspouts:
- Discharge onto your own property
- Direct water away from the foundation
- Use splash pads or extensions to prevent pooling
Ensure Proper Sump Pump Discharge
- Discharge the sump pump in accordance with the Land Drainage By-Law.
- Allow water to soak into the ground before leaving your property
See the Sump Pumps webpage for more details.
Manage Snow During Melt
- Clear snow away from:
- Foundations
- Window wells
- Downspouts
- Create a path for meltwater to drain toward:
- Rear yard swales, or
- The nearest right-of-way
Check Your Driveway Slope
- Minimum grade: 2%
- Maximum grade: 6%
- Driveways must not direct water toward buildings
Work with Your Neighbours
- Many drainage issues involve more than one property
- Discuss concerns early as your neighbour may not be aware of the issue
If you need help starting the conversation, contact engineering@steinbach.ca.
Consider Professional Help
A qualified landscaper or grading contractor can:
- Survey your property
- Identify drainage issues
- Recommend solutions to bring your lot into compliance
Still Need Help?
If you’re unsure how to proceed, the City’s Engineering Department can provide general guidance and available lot grading information.